BRG-X301Single-ended Shear Beam Load Cell for Platform Weighing
- Dust proof sealing, wide range of measurement, high accuracy, stable and reliable;
- High structural strength, simple and fast installation;
- Suitable for various force measuring and weighing industrial automation measurement control systems

Technical parameters
|
|
||
|
Rated quantitative schedule |
T |
0-10 |
|
Output sensitivity |
mV/V |
2.0±0.05 |
|
Zero point output |
%F.S. |
±1 |
|
Non-linear |
%F.S. |
0.03 |
|
lag |
%F.S. |
0.03 |
|
Repeatability |
%F.S. |
0.03 |
|
Creep (30 min) |
%F.S. |
0.03 |
|
Temperature sensitivity drift |
%F.S./10℃ |
0.03 |
|
Zero temperature drift |
%F.S./10℃ |
0.05 |
|
Response frequency |
Hz |
1k |
|
Material |
42CrMoA |
|
|
impedance |
Ω |
350 |
|
Insulation resistance |
MΩ/100V DC |
≥5000 |
|
Use voltage |
V |
5-15 |
|
Operating temperature range |
℃ |
-20-80 |
|
Safety overload |
%R.C. |
150 |
|
Extreme overload |
%R.C. |
200 |
|
Cable line specifications |
m |
Φ5*3m |
|
Cable limit pull force |
N |
98 |
|
TEDS |
selectable |
|
Dimension (mm)


|
Range |
A |
B |
C |
D |
E |
W |
H |
M |
2-φ |
I |
|
50kg-2T |
130 |
15 |
25 |
76 |
30 |
32 |
32 |
M12*1.75 |
φ13 |
56 |
|
2.5-5T |
171 |
19 |
38 |
96 |
38 |
38 |
43 |
M18*1.5 |
Φ20 |
80 |
|
6-10T |
225.6 |
25.4 |
50.8 |
122.9 |
50.8 |
50.8 |
56 |
M24*2 |
Φ26.4 |
105 |
Force Diagram

42CrMo alloy steel material
Corrosion-resistant, with high strength and toughness strong resistance to mechanical fatigue and good hardenability


6 corner waterproof joint
With spring buffer,good sealing effect, durable Prevents breakage caused by wire pulling
Long Term Stable Performance Stable Structure/precise Weighing And Measurement
Low height, accurate measurement, long-term stabilityand strong anti-eccentric load ability.Widely used in various weighing and force measuring equipment such as belt scales, hopper scales, storage scales, tanks, floor scales industrial weighing systems, etc.


FAQ
Q: Can we use our own logo?
Q: Could I visit your factory?
Q: How can you make delivery ?
Q: What is the payment term ?
Q: What is the lead time ?

























